Location.

Horizon Valencia Logistics Park is strategically located in the Moncada III Industrial Estate in Moncada, just 20 km from the center of Valencia. Its proximity to the Port of Valencia and Port of Sagunto makes it a privileged logistics hub.

Moncada lies within Valencia’s Prime logistics zone, between Ribarroja Loriguilla and Sagunto, an emerging area rapidly becoming a key logistics axis in the region.

 Distances from Horizon Valencia Logistics Park:

– Valencia: 20 km | 18 min.

– Port of Valencia: 21 km | 22 min

– Port of  Sagunto: 22 km | 23 min.

– Airport of Valencia: 33 km | 25 min.

– Barcelona: 338 km

– Madrid: 362 km

Horizon Valencia Logistics Park in detail.

TOTAL BUILT AREA
0 sqm

PHASE 1

0 sqm

PHASE 2

0 sqm

PHASE 3

0 sqm
FREE HEIGHT
UNDER ROOF
0 ,7 m
LOADING DOCKS
0
PARKING SPACES
FOR LIGHT VEHICLES
0
ENVIRONMENTAL
CERTIFICATION
"BREEAM
OUTSTANDING"
LED LIGHTING
PHOTOVOLTAIC
ROOFTOP PANELS FOR
SELF-CONSUMPTION
FLEXIBLE PROJECT
ADAPTABLE TO
TENANT NEEDS
STRATEGIC LOCATION
WITH EXCELLENT
NATIONAL AND
EUROPEAN
CONNECTIVITY
HIGH QUALITY
CONSTRUCTION AND
DESIGN STANDARDS
ACCESS TO LARGE
LOCAL WORKFORCE
Horizon Valencia Logistics Park covers 181,453 sqm of land and will include four logistics assets built over three adaptable phases, with a total buildable area of 123,286 sqm, adaptable to tenant needs.
All units include office space suitable for any type of business and locker rooms within the warehouse area, designed for collaborative and flexible work models that prioritize people’s well-being.
 
The design of both the project and the units prioritizes high efficiency in storage capacity and operational flow, making it ideal for logistics operations or corporate headquarters in a prime last-mile location.

PHASE 1

PHASE 1 consists of a flexible building of 8
modules of 5,000 sqm each, with a total
of 1,514 sqm of office space divided into
two floors, making a total of 40,955 sqm
constructed.
Delivery: March 2026

PHASE 2

PHASE 2 consists of a flexible building of 2
modules of between 14,000 sqm and 24,000
sqm, with an office space of 1,705 sqm divided
into two floors for each of the modules, with a
total of 39,942 sqm constructed.
Delivery: June 2026

PHASE 3

PHASE 3 consists of a warehouse of more
than 40,000 sqm, with 1,821 sqm of office
space spread across three floors, totaling
42,389 sqm of built area. This phase also
contemplates the possibility of a turnkey
development tailored to future tenants’
needs.
Delivery: October 2026